Provinsi Sulawesi Utara · Indonesia
Invest North Sulawesi

Manufacturing and raw materials

Indonesia keeps its raw materials at home. Build where they are processed.

Indonesia’s minerals may not leave the country unprocessed, so the factory goes to them. Gold and silver mined here, titanium sands and copper prospects in the ground, nickel next door: build in a free zone at a deep-sea port, with one team from first question to running plant.

534 hafree zone KEK Bitung beside the deep-sea port (PP 32/2014)
10–20 years0% corporate tax in the free zone, from Rp 100 billion (PMK 237/2020)
3 export bansunprocessed nickel ore (2020), bauxite (2023) and copper concentrate (2025) stay in Indonesia (Minerba Law 3/2020; Permen ESDM 11/2019)
Rp 4,002,630minimum monthly wage 2026 (Governor Decree 404/2025)

The rule: process in Indonesia, or buy from those who do

Indonesia’s mining law (Law 3/2020, amended by Law 2/2025) requires domestic processing. The export bans are firm, and the government controls volumes and prices.

Nickel ore
Export banned since 1 January 2020.
Bauxite
Export banned since 10 June 2023.
Copper concentrate
Banned in principle since 1 January 2025; the last exception (Freeport) ended on 16 September 2025.
Iron, lead and zinc ore
Export of ore not allowed; concentrates only under time-limited exceptions.
New nickel smelters
Since 28/2025 there are no new industrial licences for stand-alone plants that make nickel pig iron, ferronickel, nickel matte or . A wider stop on new plants (moratorium) is under study (October 2026).
Volumes and prices
The 2026 nickel ore quota was cut from 379 million tonnes (Mt) in 2025 to about 295–300 Mt. A higher benchmark price applies from April 2026.
Under study
A ban on more raw commodities, including tin (February 2026).
Agricultural and marine raw materials
Not banned, but controlled with export levies (palm oil 12.5% from March 2026, cocoa beans 7.5% from October 2025).

What this means: a new is hardly possible, but everything after the first processing step is open. That last mile, from semi-finished product to component and finished good, is where mid-sized manufacturers fit best.

Value chain

From minerals to product: where Bitung fits

Indonesia keeps the first processing steps in the country, and large groups already run them. The space for new manufacturers is further down the chain.

  1. Ore

    Nickel, bauxite, copper, iron

    Export banned; mined and smelted in the nickel parks of North Maluku and Central Sulawesi.

    Closed to export
  2. Semi-finished

    Nickel pig iron, stainless steel, MHP, aluminium, cathode copper

    Made in Indonesia by large groups; no new licences for stand-alone nickel smelters since PP 28/2025.

    Large groups
  3. Component

    Tubes, fasteners, aluminium profiles, battery packs, instruments

    The last mile: few named plants yet, and local-content rules pull demand.

    Open: Bitung fits here
  4. Product

    Prefab building elements, medical devices, e-motorcycle packs, food and marine products

    Sold to Indonesian buyers who prefer local content, or shipped out through Bitung.

    Open: Bitung fits here

The province adds its own feedstock: coconut (266,052 t in 2024), tuna and clove (10,327 t) go from harvest to processing in KEK Bitung, with no export ban in between.

Sources: Law 3/2020 (Minerba); PP 28/2025; Permenkes 5/2026; local-content rules for e-motorcycles; BPS Sulawesi Utara. November 2026.

Read the story: from ore to product, in eight chapters

Looking for mining itself rather than processing? Mining & Quarrying · Gold mining in North Sulawesi

Grid power here or captive coal? Compare CO2 and EU CBAM cost

The neighbours

Beside the North Maluku nickel corridor

East of Bitung lie the nickel parks of Weda Bay and Obi. They have their own ports, so Bitung is not their gateway. It is the nearest large container terminal: a base for fabrication, maintenance, spare parts and logistics.

  • Bitung port and KEK BitungDeep-sea container port with the 534 ha free zone beside it
  • Weda BayNickel industrial park on Halmahera, North Maluku≈ 330 km from Bitung
  • ObiNickel processing on Obi island, North Maluku≈ 420 km from Bitung
  • TernateNorth Maluku cargo that SPIL tranships in Bitung≈ 250 km from Bitung
  • Manado airportDirect flights to Seoul, Singapore and Guangzhou
74,928 TEUhandled at the Bitung container terminal in Q1 2025, up 21%LogistikNews, 7 May 2025

Distances are straight lines (great circle) and indicative; sailing routes are longer. Positions are approximate.

Your route to raw materials

Twelve routes, from a trading company to a joint venture with a state miner. Choose your company size and the raw material you need. Our team works with plans from US$ 10 million.

Company size
Raw material

12 / 12

Own plant or stake

A. Own processing or finishing plant

A builds a plant that turns Indonesian materials into semi-finished or finished products.

Fits Mid-sizedLarge groupMetals and mineralsSemi-finished productsRecovered materialsAgricultural and marine

Entry level
Paid-up capital Rp 2.5 bn (≈ US$ 136,889); investment over Rp 10 bn (≈ US$ 547,555) per business line per location
Legal basis
Industrial licence () or processing permit; Reg. 5/2025; PP 28/2025
Real example
B. Braun’s IV-fluid plant in Cikampek (opened 2017)
What we do
Site choice, PT PMA, licences, build and hiring, A to Z
Discuss this route
Own plant or stake

B. Stake in a mining company

Buy shares in a company with a mining licence ( or IUPK). Foreign owners must sell at least 51% to Indonesian parties by year 25 of production.

Fits Large groupMetals and minerals

Entry level
Project-specific; long horizon
Legal basis
Law; PP 96/2021 Art. 147
Real example
Eramet holds 38.7% of Weda Bay Nickel (North Maluku)
What we do
Introductions, partners
Discuss this route
Own plant or stake

C. Joint venture with a miner, smelter or state company

Partner with an Indonesian company that holds ore. The foreign partner brings technology, capital or a guaranteed purchase ().

Fits Mid-sizedLarge groupMetals and mineralsAgricultural and marine

Entry level
Project-specific
Legal basis
Company law plus the partner’s permits
Real example
Vale Indonesia with Huayou and Ford at Pomalaa; Harita with Lygend on Obi
What we do
Partner search and introductions
Discuss this route
Own plant or stake

D. Co-investment with or

The state investment fund leads processing projects. Later phases may open to foreign co-investors.

Fits Large groupMetals and minerals

Entry level
Large tickets
Legal basis
Danantara mandate; state-company joint ventures
Real example
Danantara with GEM on a US$ 1.4 bn smelter (announced 2026)
What we do
Contact with the provincial government and agencies
Discuss this route
Contract

E. Offtake or prepayment contract

Agree to buy future production, or pay in advance and receive the goods later. No Indonesian company needed.

Fits Specialised or family companyMid-sizedLarge groupMetals and mineralsSemi-finished productsRecovered materialsAgricultural and marine

Entry level
No legal minimum; our team works with plans from US$ 10 million
Legal basis
Commercial contract; export approval for processed products
Real example
Tesla’s supply contracts with Huayou and CNGR (2022)
What we do
Supplier search, contracts, quality checks
Discuss this route
Contract

F.

An Indonesian plant processes your material for a fee. You keep ownership.

Fits Mid-sizedMetals and mineralsAgricultural and marine

Entry level
No legal minimum; our team works with plans from US$ 10 million
Legal basis
To be confirmed per case with the Energy Ministry (ESDM)
Real example
No published example yet
What we do
Find a processor and set up the contract
Discuss this route
Contract

G. Trading company

A foreign-owned wholesale PT buys semi-finished or agricultural products and exports them.

Fits Specialised or family companyMid-sizedSemi-finished productsRecovered materialsAgricultural and marine

Entry level
Paid-up capital Rp 2.5 bn (≈ US$ 136,889); Rp 10 bn (≈ US$ 547,555) counted per 4-digit KBLI group (to confirm)
Legal basis
Wholesale business lines (KBLI 46xxx); importer number
Real example
Common route for mid-sized importers and exporters; no single named case
What we do
Company set-up, suppliers, export documents
Discuss this route
Location

H. Plot in a free zone or industrial park

Rent serviced land in KEK Bitung or an industrial park, with tax and customs facilities.

Fits Mid-sizedLarge groupMetals and mineralsSemi-finished productsRecovered materialsAgricultural and marine

Entry level
Tax holiday from Rp 100 bn (≈ US$ 5.5 M) investment
Legal basis
PP 40/2021; 237/2020 PMK 33/2021
Real example
Unilever’s oleochemical plant in KEK Sei Mangkei
What we do
Zone application and licensing
Discuss this route
Recovered materials

I. Mine tailings, recycling and by-products

Recover metals and minerals from mine waste or scrap, alone or as technology partner of a permit holder.

Fits Specialised or family companyMid-sizedRecovered materials

Entry level
Project-specific
Legal basis
Minerba Law (associated minerals); PP 96/2021; PP 22/2021 (waste)
Real example
ESMI (affiliated) recovers gold and silver from tailings in Bolaang Mongondow
What we do
Access to recovered material, permits, partners
Discuss this route
Agricultural and marine

J. Agricultural and marine processing

Process coconut, tuna, spices or palm locally; mostly open to 100% foreign ownership.

Fits Specialised or family companyMid-sizedLarge groupAgricultural and marine

Entry level
Rp 2.5 bn (≈ US$ 136,889) paid-up; Rp 10 bn (≈ US$ 547,555) per business line
Legal basis
10/2021; PP 11/2023 (fisheries)
Real example
PT Freenow Food Industry’s US$ 100 m coconut plant in Morowali (2026); Apical–Kao in Dumai
What we do
Sourcing, cooperatives, plant set-up
Discuss this route
Policy and small scale

K. Government-to-government framework

Trade agreements give political cover; companies still contract the supply.

Fits Large groupMetals and minerals

Entry level
Not applicable
Legal basis
US–Indonesia trade agreement (19 Feb 2026); EU–Indonesia (expected 2027)
Real example
Danantara matchmaking with US companies
What we do
Government briefings and delegation programmes
Discuss this route
Policy and small scale

L. Cooperatives and contract manufacturing

Buy from cooperatives or have a local plant produce for you under contract ().

Fits Specialised or family companyAgricultural and marine

Entry level
No legal minimum; our team works with plans from US$ 10 million
Legal basis
Law 2/2025; Permenkes 5/2026 Art. 18 and 21 (medical devices)
Real example
Luckin Coffee’s coconut supply deal with Banggai Kepulauan (2025)
What we do
Find cooperatives and contract producers
Discuss this route

Open niches in the last mile

Indonesia already makes stainless steel, aluminium, cathode copper and nickel intermediates. Much of the next step is still missing.

Stainless steel products

Tubes, fasteners, cutlery and instruments: no named plants found yet beside the large melt shops in Morowali.

Aluminium profiles and prefab building elements

About 1.55 Mt of aluminium capacity in 2026 with weak domestic demand, plus construction demand from the new capital city, Nusantara ().

Battery packs and controllers

Electric motorcycles need 40% local content in 2026, 60% in 2027–29 and 80% from 2030.

Medical devices

5/2026 lets public buyers choose domestic products even when they cost more, and allows contract manufacturing.

Titanium

Indonesia has no titanium sponge or titanium dioxide (TiO2) pigment plant and imports its pigment.

Food and marine processing

Coconut (266,052 t in North Sulawesi in 2024), tuna by-products and spice extracts.

Export products: HS codes, certificates and ports

Why North Sulawesi

  • Beside the nickel corridor

    Bitung is the nearest large container terminal to the North Maluku nickel parks (Weda Bay, Obi); the shipping line SPIL moves Ternate cargo between ships there. The parks have their own ports, so we position Bitung as a base for fabrication, maintenance and logistics, not as their gateway.

  • Own raw materials

    Gold (Toka Tindung about 122,000 ounces in 2025; Bakan), coconut, tuna, clove (10,327 t) and nutmeg.

  • Clean power

    Geothermal Lahendong (120 MW, expansion planned); a third of the grid is renewable. For low-carbon products you need a dedicated power contract.

  • Costs

    Minimum wage Rp 4,002,630 a month in 2026, about 70% of Jakarta.

  • Free zone

    KEK Bitung: 534 ha for coconut, fisheries, pharmaceuticals and logistics, with a 10–20 year tax holiday.

KEK Bitung

Affiliated project

Local feedstock from mine-waste clean-up

ESMI cleans legacy gold-mine tailings in Bolaang Mongondow without mercury or cyanide. Gold and silver are recovered, and factories that investors start in North Sulawesi can request supply terms. Further minerals, such as titanium mineral concentrate, are offered only after independent laboratory assays. For a manufacturer this means a traceable, local supply from cleaned mine waste instead of new mining.

  • Gold and silver. Recovered from the cleaned tailings. Supply terms on request.
  • Further minerals. Titanium mineral concentrate (ilmenite or rutile) and other minerals are offered only after independent laboratory assays confirm them.
  • Clean stone powder. The cleaned rock powder is used for paving blocks and bricks after leach tests; ask whether it fits your product.
  • Made for local processing. Indonesia’s mining law favours processing in the country, so supply is aimed at factories in North Sulawesi.

No volumes, grades or prices are published. The pilot runs from November 2026; supply terms depend on the pilot results and on the permit for selling associated minerals, and are agreed per contract. This is not an offer by the Provincial Government of North Sulawesi.

The honest picture

  • KEK Bitung has room to grow: about 4.4% of its land was in use in mid-2026 and investment figures from the province and the Investment Ministry differ.
  • The Sulawesi grid has a limited reserve (about 174 MW across the whole Suluttenggo region, August 2026); large power users need their own supply.
  • Groups with a turnover of €750 million or more pay at least 15% under the global minimum tax, also during a tax holiday.
  • Several fully Western metal projects stopped (BASF–Eramet 2024, Sumitomo 2022); successful newcomers joined as minority partner or buyer beside a fast builder and a local partner.

Your plant in nine steps, A to Z

  1. 1Route and siteChoose the access route, the location and the free-zone fit.
  2. 2CompanyPT PMA deed, and business lines ().
  3. 3Zone facilities, customs and VAT facilities in Bitung.
  4. 4LicencesIndustrial licence and sector permits (, health ministry).
  5. 5Environment or environmental approval.
  6. 6BuildLand, design, contractors and utilities, including power.
  7. 7PeopleHiring, training with local universities, work permits for expatriates.
  8. 8Local content certification for government buyers.
  9. 9AftercareCompliance calendar, reporting and expansion.

Ready to build?

Four ways to take the next step, from a fixed-price factory to a free 30-minute call.

Sources: Law 3/2020 and Law 2/2025 (Minerba); PP 28/2025; PP 39/2025; BKPM Reg. 5/2025; PP 40/2021; PMK 136/2024; Indonesia Business Post; Argus; Jakarta Post (9 Oct 2026); Reuters; company releases; BPS Sulawesi Utara; Governor Decree 404/2025. Full research with links: on request. November 2026; not legal or tax advice.