CO2 and CBAM calculator
Produce greener in North Sulawesi
Compare the CO2 from your electricity on the North Sulawesi grid with a captive coal plant, the set-up of the nickel parks in Central Sulawesi and North Maluku. See what it means for the EU carbon border tax (CBAM).
Your result
138,830 t CO2 less per year
from your electricity on the North Sulawesi grid instead of a captive coal plant: 36% less.
Electricity: 381,400 MWh a year, about 43.5 MW around the clock.
Grid: estimate from the PLN mix of 1 Aug 2024. Coal: ESDM emission cap, 24 Jan 2023. Electricity only; process emissions are not included.
EU CBAM on your exports
Today: no difference in CBAM cost. For iron and steel (ferronickel included), aluminium and hydrogen, CBAM charges only the direct emissions of the production process. Electricity is not charged, whether it comes from the grid or your own coal plant. Only cement and fertilisers pay CBAM on their electricity.
If the EU adds electricity. The CBAM Regulation asks the European Commission to assess adding indirect emissions for these goods (Article 30). If it does, the grid would save you about €85,713 a year in 2026 (2.5% phase-in on 30% EU sales) and €3,428,536 a year at the full rate from 2034.
Direct emissions (coal as a reducing agent, fuel for kilns and boilers) are the same in both cases. For ferronickel and steel they are what CBAM charges, and they are not in this calculator.
Indicative, not legal, tax or engineering advice; no rights can be derived from it. CBAM rules as understood on 14 November 2026 (Regulation (EU) 2023/956 and its implementing acts). Check your case with your EU importer and a CBAM verifier. Disclaimer
How we calculate: method and all 12 sources
How we calculate
- CO2 per tonne = electricity per tonne (MWh) × emission factor (t CO2 per MWh). CO2 per year = CO2 per tonne × tonnes per year. Only electricity is counted (scope 2).
- North Sulawesi grid, 0.647 t CO2 per MWh (our estimate): PLN gives the mix of the North Sulawesi–Gorontalo grid (SulutGo) as 33% renewable, 61% coal, 5.64% gas and the rest oil (PLN UID Suluttenggo, 1 Aug 2024). We count coal at 1.011 like the captive plant, gas at 0.50 and oil at 0.65 (Wei et al. 2020); renewable power counts as zero.
- Geothermal power from Lahendong (120 MW, six units) supplies about 26% of SulutGo power at peak load (PGE Lahendong, 31 Oct 2026). More geothermal is planned, so the grid factor should fall over time.
- Captive coal plant, 1.011 t CO2 per MWh: the emission cap of the Ministry of Energy (ESDM) for coal plants of 100–400 MW (Kepmen ESDM 14.K/TL.04/MEM.L/2023, 24 Jan 2023). Captive units in the nickel parks are mostly 135–380 MW (CREA and GEM, 2024). Small or old units can emit more, so this figure is cautious.
- Official grid factor: ESDM publishes 1.49 t CO2 per MWh for Sulutgo (table of 2017, reproduced in the JCM methodology ID_PM037). It is a baseline for carbon credits that counts only coal, gas and oil plants, not geothermal or hydro, so it is not the average CO2 of the power you buy. We show it but do not use it.
- CBAM goods: the definitive period started on 1 January 2026 (Regulation (EU) 2023/956). Only direct emissions count for iron and steel, aluminium, hydrogen and electricity (Annex II). Indirect emissions from electricity count for cement and fertilisers. Ferronickel (CN 7202 60) and semi-finished steel (CN 7207) are CBAM goods; coconut oil is not.
- Phase-in: CBAM is paid only on the share no longer covered by free EU allowances: 2.5% in 2026, 5% in 2027, 10% in 2028, 22.5% in 2029, 48.5% in 2030, 61% in 2031, 73.5% in 2032, 86% in 2033 and 100% from 2034 (Directive 2003/87/EC, art. 10a, as amended by Directive (EU) 2023/959). We apply the share to all emissions; the real deduction uses EU benchmarks, so our figure is an upper bound.
- Price: € 82.32 per t CO2, the CBAM certificate price for the third quarter of 2026 (European Commission, 5 Oct 2026). EU allowances traded around € 90 on 13 Nov 2026. From 2027 the Commission publishes a weekly price.
- Default values: an EU importer without verified emission data from the producer must use EU default values, with a mark-up of 10% in 2026, 20% in 2027 and 30% from 2028 (Implementing Regulation (EU) 2025/2621). Verified plant data usually costs less.
- Electricity per tonne: ferronickel 7.63 MWh (Wei et al. 2020, model of a rotary kiln and electric furnace plant, 35% nickel; lower-grade nickel pig iron uses less per tonne); steel 0.474 MWh (UNIDO 2014, best practice for a scrap-fed electric arc furnace); refined coconut oil 0.402 MWh (Yani et al. 2022, an Indonesian plant); crude coconut oil 0.308 MWh (our calculation from the same study, without refining).
- A large plant needs a supply agreement with PLN. Check grid capacity early: a ferronickel line uses tens of megawatts around the clock.
Sources (checked 14 November 2026)
- PLN UID Suluttenggo, energy mix of the SulutGo grid (ANTARA Manado, 1 Aug 2024)
- PGE Lahendong: geothermal supplies about 26% of SulutGo power at peak load (IndiNews, 31 Oct 2026)
- Ministry of Energy (ESDM): emission caps for coal power plants, PTBAE phase I (24 Jan 2023)
- JCM methodology ID_PM037, grid emission factors of Indonesia, Appendix 2: official ESDM table
- CREA and Global Energy Monitor: Indonesia's captive coal on the uptick (Nov 2024)
- Wei et al. (2020), Energy consumption and greenhouse gas emissions of nickel products, Energies 13(21) 5664
- UNIDO (2014), Benchmarking report for the iron and steel sector
- Yani et al. (2022), Life cycle assessment of coconut oil product, IOP Conf. Series 1063 012017
- Regulation (EU) 2023/956 establishing CBAM (EUR-Lex)
- European Commission: CBAM certificate price (Q3 2026: € 82.32, published 5 Oct 2026)
- GMK Center: EU carbon prices above € 90 per tonne in November 2026
- Directive (EU) 2023/959 amending the EU ETS: free allocation phase-out (EUR-Lex)