Provinsi Sulawesi Utara · Indonesia
Invest North Sulawesi

Deal room

Projects you can join now

Every open project with its progress, ticket and structure. Register your interest in one click, or request the data room under NDA.

7 projects

Filters
Sector
Location
Progress
Entry ticket

Tick “Compare” on two or three projects.

Step 1 of 5 · Idea

Likupang Esports & Entertainment District: arena, production studio and game-services campus

An esports and events destination on the coast of North Minahasa with a game-services campus in Manado: an estimated US$ 75–110 million in phases, starting with the campus and a production studio of about US$ 20–30 million.

Game Development, Esports & AnimationEvents & MICETourism & Hospitality
SDG 4SDG 8SDG 9SDG 11SDG 17
  1. 1Idea
  2. 2Plan
  3. 3Permits & partners
  4. 4Pilot
  5. 5Scale-up
Ticket
Estimated US$ 75–110 million in phases; phase 1 (campus and production studio) about US$ 20–30 million; participation from US$ 10 millionFrom US$ 10 million
Structure
District developer with separate operators for arena, hotel and campus; anchor contracts with a league organiser or tournament operator and with studio clients; co-investment by funds, hospitality groups or sovereign investors possible
Location
North Minahasa, Manado City
Documents on request 5
  • Games, esports and animation research, northsulawesi.org (13 November 2026)
  • Presidential Regulation 19/2024 on the national game industry
  • Government Regulation 84/2019 on KEK Likupang
  • Niko Partners, Southeast Asia games market (2026)
  • MDEC SEA Game Development Talent Economics Report 2024

Shared after a first conversation; financial models and terms under NDA.

Request data room (NDA)
View the project
Step 1 of 5 · Idea

North Sulawesi AI Hub: an AI campus at Indonesia’s Pacific gateway

A phased AI and cloud campus beside two trans-Pacific cable landings, powered by geothermal energy: Phase 1 from US$ 100 million, growing to about 100 MW of IT load.

Data Centres & AI ComputeEnergy & RenewablesICT & Digital
SDG 4SDG 7SDG 8SDG 9SDG 13SDG 17
  1. 1Idea
  2. 2Plan
  3. 3Permits & partners
  4. 4Pilot
  5. 5Scale-up
Ticket
Phase 1 from US$ 100 million; estimated total about US$ 1.7–1.8 billion in phases to about 100 MW, excluding tenant IT and GPUsFrom US$ 10 million
Structure
Developer or hyperscaler campus on a reserved site; own use or leased capacity; co-investment by infrastructure funds or sovereign investors possible
Location
North Minahasa, Manado City, Bitung City
Documents on request 4
  • Data-centre investor dossier, northsulawesi.org/data-centres (13 November 2026)
  • Turner & Townsend Data Centre Construction Cost Index 2026–27
  • IRENA Renewable Power Generation Costs in 2024
  • PLN UID Suluttenggo system figures (August 2026)

Shared after a first conversation; financial models and terms under NDA.

Request data room (NDA)
View the project
Step 1 of 5 · Idea

Turnkey factory in KEK Bitung: prefab and processing plants

We build your plant for you: a prefabricated factory hall in the free zone beside Bitung’s deep-sea port, ready for your production line, from permit to opening day.

Affiliated with the site teamManufacturing & Agro-industryConstruction & InfrastructureTransport, Ports & Logistics
  1. 1Idea
  2. 2Plan
  3. 3Permits & partners
  4. 4Pilot
  5. 5Scale-up
Ticket
Costs on request: they depend on hall size, production line and site
Structure
Turnkey contract with a fixed price per phase; other structures on request
Location
Bitung City
Documents on request 3
  • PP 40/2021 (Special Economic Zones)
  • PMK 237/2020 jo. PMK 33/2021 (free-zone tax holiday)
  • Governor Decree 404/2025 (minimum wage 2026)

Shared after a first conversation; financial models and terms under NDA.

Request data room (NDA)
View the project
Step 4 of 5 · Pilot

ESMI 10-tonner: cleaning up mine waste

Turn toxic gold-mine waste into clean land, bricks and recovered gold, starting with a permitted 100 ha site in Bolaang Mongondow.

Affiliated with the site teamMining & QuarryingWater, Waste & RecyclingConstruction & Infrastructure
SDG 3SDG 5SDG 6SDG 8SDG 9SDG 12SDG 15SDG 17
  1. Idea
  2. Plan
  3. Permits & partners
  4. 4Pilot
  5. 5Scale-up
Ticket
Participation from US$ 10 million, in tranches of US$ 1.7 million per 10 t/h machineFrom US$ 10 million
Structure
Revenue-linked tranche per machine; full terms in the investor brief
Location
Bolaang Mongondow
Documents on request 2
  • ESMI investor brief, 1 November 2026
  • ESMI Bolmong dossier, 31 October 2026

Shared after a first conversation; financial models and terms under NDA.

Request data room (NDA)
View the project
Step 2 of 5 · Plan

Private Island Events on Sara Besar

Week-long international events on the white-sand Sara islands in Talaud: business, culture, music, wellness and star-chef weeks, with the villages as hosts.

Affiliated with the site teamEvents & MICETourism & HospitalityCreative Economy & Culinary
SDG 8SDG 10SDG 11SDG 12SDG 14SDG 17
  1. Idea
  2. 2Plan
  3. 3Permits & partners
  4. 4Pilot
  5. 5Scale-up
Ticket
Year-1 production budget US$ 18 million for four signature eventsFrom US$ 10 million
Structure
Co-production, sponsorship and equity in reusable infrastructure
Location
Talaud Islands
Documents on request 2
  • Private Island Events Business Plan, Sara Besar & Sara Ketjil (17 September 2026)
  • Talaud Islands 2036 Investment Memorandum (October 2026)

Shared after a first conversation; financial models and terms under NDA.

Request data room (NDA)
View the project
Step 2 of 5 · Plan

Royal Ikan: tuna and reef fish from the Talaud Islands

Our own fish-export company. Yellowfin, bigeye, marlin and reef fish from Indonesia’s northernmost islands, handled for premium grade and documented per fish, for importers and processors in Europe, Japan and Asia.

Affiliated with the site teamFisheries & SeafoodTransport, Ports & LogisticsManufacturing & Agro-industry
SDG 1SDG 2SDG 8SDG 12SDG 14SDG 17
  1. Idea
  2. 2Plan
  3. 3Permits & partners
  4. 4Pilot
  5. 5Scale-up
Ticket
Cold-chain participation from US$ 10 million; one ice package with generator costs about €27,500From US$ 10 million
Structure
B2B supply contracts for buyers; equipment finance or project equity for cold-chain investors
Location
Talaud Islands, Bitung City
Documents on request 2
  • Royal Ikan business plan and catch protocol (October 2026)
  • Royal Ikan website copy v0.1 (26 October 2026)

Shared after a first conversation; financial models and terms under NDA.

Request data room (NDA)
View the project
Step 2 of 5 · Plan

North Sulawesi 2036: a second life for mined land

A ten-year programme to make every mapped hectare of mining land in North Sulawesi safe and productive again: fields, forest, lakes, clean energy and eco-tourism.

Affiliated with the site teamMining & QuarryingAgriculture & PlantationsEnergy & Renewables
SDG 1SDG 2SDG 5SDG 6SDG 7SDG 8SDG 10SDG 13SDG 15SDG 16SDG 17
  1. Idea
  2. 2Plan
  3. 3Permits & partners
  4. 4Pilot
  5. 5Scale-up
Ticket
Participation from US$ 10 million; programme from a Rp 66 bn start (≈ US$ 3.7 M) up to Rp 578 bn in full (≈ US$ 32 M)From US$ 10 million
Structure
Grants, project equity in earning assets, impact partnership, blended facility
Location
North Minahasa, Southeast Minahasa, Bolaang Mongondow
Documents on request 1
  • North Sulawesi 2036 Investment Memorandum (ESMI, October 2026)

Shared after a first conversation; financial models and terms under NDA.

Request data room (NDA)
View the project

Progress reflects each project’s own documents and our assessment; it is not an offer or a guarantee. Affiliated projects are marked.