ESMI 10-tonner: cleaning up mine waste
Turn toxic gold-mine waste into clean land, bricks and recovered gold, starting with a permitted 100 ha site in Bolaang Mongondow.
Status: Pilot from November 2026 · first 10 t/h machine planned for March 2027
Deal sheet
- Ticket size
- Participation from US$ 10 million, in tranches of US$ 1.7 million per 10 t/h machine
- Stage
- Pilot · Step 4 of 5Pilot from November 2026; first 10 t/h machine March 2027
- Land
- Site allocatedPermitted 100 ha site in Bolaang Mongondow.
- Location
- Bolaang Mongondow
- Source
- ESMI investor brief, 1 November 2026
- ESMI Bolmong dossier, 31 October 2026
Every value comes from the project’s own documents, listed under Sources. Where those documents do not give a value, we show “Not yet known” instead of an estimate.
The challenge
Illegal gold mining has left heaps of crushed, cyanide-leached rock across Indonesia. ESMI has mapped 38,365 mining footprints at gold sites nationwide, 1,484 of them in Sulawesi. The heaps still contain gold and other metals, and also mercury, cyanide and arsenic that end up in rivers, rice fields and fish. Nobody owns the clean-up.
The approach
- 1Measure
Satellite mapping, field visits and on-site XRF screening, confirmed with fire assay in the lab.
- 2Clean
The ESMI 10-tonner grinds the heap stone to powder; ESMI microbes, developed with Universitas Islam Malang (Unisma), neutralise cyanide and bind mercury. No mercury or cyanide is used.
- 3Recover
Gold, silver and other minerals are separated on a shaking table; gold goes to an Indonesian bullion bank or, on supply terms, to factories in North Sulawesi. The metal pays for the clean-up.
- 4Build
The clean stone powder becomes paving blocks and bricks after leach tests: zero waste.
- 5Restore
With universities, the old mine becomes an eco park, fruit gardens and rice and cassava fields.
Timeline
- Nov 2026Buildings, two 0.5 t/h test units, baseline of water and soil
- Dec 2026Pilot on the richest heaps; mass and mercury balance
- Jan–Feb 2027Go/no-go; first 10 t/h machine ordered
- Mar 2027First 10 t/h machine on site
- 2027–2028Heaps in the permit cleaned
- ±2031Site restored as an eco park
Investment summary
- Structure
- Revenue-linked tranche per machine; full terms in the investor brief
- Use of funds
- Machines, processing plant, laboratory and site restoration
How to take part
- Investors fund ESMI 10 t/h machines, with participations from US$ 10 million; the terms are set out in the investor brief, available on request.
- Visit the site and validate the heaps with your own geologist.
- Every machine has sensors and live data in the ESMI investor app: tonnes, grade and gold recovered.
- Factories in North Sulawesi: request supply terms for recovered gold and silver; further minerals, such as titanium mineral concentrate, only after independent laboratory assays.
Investor brief: ESMI 10-tonner (English, 6 pages)
The full investor brief of 7 November 2026: the problem, the machine, the Bolaang Mongondow pilot, the investment proposal and the terms. Confidential: shared after a short request.
Affiliated project
Raw materials for your factory, recovered from cleaned mine waste
ESMI, a project affiliated with the northsulawesi.org team, cleans legacy gold-mine tailings in Bolaang Mongondow without mercury or cyanide. Prefab and processing factories that investors set up in North Sulawesi can ask ESMI for supply terms for the materials it recovers: a local, traceable source instead of new mining.
- Gold and silver. Recovered from the cleaned tailings. Supply terms on request.
- Further minerals. Titanium mineral concentrate (ilmenite or rutile) and other minerals are offered only after independent laboratory assays confirm them.
- Clean stone powder. The cleaned rock powder is used for paving blocks and bricks after leach tests; ask whether it fits your product.
- Made for local processing. Indonesia’s mining law favours processing in the country, so supply is aimed at factories in North Sulawesi.
No volumes, grades or prices are published. The pilot runs from November 2026; supply terms depend on the pilot results and on the permit for selling associated minerals, and are agreed per contract. This is not an offer by the Provincial Government of North Sulawesi.
Partners
- ESMI · Eco Sustainable Mining Initiative
- Universitas Islam Malang (Unisma): microbes and laboratory
- Provincial Government of North Sulawesi: partnership on clean-up and restoration
Related sectors