Turnkey factory in KEK Bitung: prefab and processing plants

We build your plant for you: a prefabricated factory hall in the free zone beside Bitung’s deep-sea port, ready for your production line, from permit to opening day.

Status: Open for enquiries · costs on request

Deal sheet

Ticket size
Costs on request: they depend on hall size, production line and site
Stage
Idea · Step 1 of 5Open for enquiries
Land
Candidate sitesA plot in KEK Bitung, chosen for each client project.
Location
Bitung City · KEK Bitung
Source
  • PP 40/2021 (Special Economic Zones)
  • PMK 237/2020 jo. PMK 33/2021 (free-zone tax holiday)
  • Governor Decree 404/2025 (minimum wage 2026)

Every value comes from the project’s own documents, listed under Sources. Where those documents do not give a value, we show “Not yet known” instead of an estimate.

10–20 years0% corporate tax in the free zone, from Rp 100 billion of investment
534 hatotal area of KEK Bitung
Rp 4,002,630minimum monthly wage 2026
1 teamone contact person from intake to opening day

The challenge

Building a plant in Indonesia means many permits, land and title checks, contractors and a power contract, in a language and system that are new to most foreign companies. That costs months and makes budgets uncertain.

The approach

  1. 1
    Prefab hall

    Steel-frame factory and warehouse halls from prefabricated modules, sized to your production line.

  2. 2
    Site in the free zone

    A plot in KEK Bitung with the tax holiday, customs and VAT facilities.

  3. 3
    Permits and power

    Industrial licence, environmental approval, building approval and a dedicated power contract.

  4. 4
    People

    Hiring and training with local universities and work permits for your managers.

Affiliated project

Raw materials for your factory, recovered from cleaned mine waste

ESMI, a project affiliated with the northsulawesi.org team, cleans legacy gold-mine tailings in Bolaang Mongondow without mercury or cyanide. Prefab and processing factories that investors set up in North Sulawesi can ask ESMI for supply terms for the materials it recovers: a local, traceable source instead of new mining.

  • Gold and silver. Recovered from the cleaned tailings. Supply terms on request.
  • Further minerals. Titanium mineral concentrate (ilmenite or rutile) and other minerals are offered only after independent laboratory assays confirm them.
  • Clean stone powder. The cleaned rock powder is used for paving blocks and bricks after leach tests; ask whether it fits your product.
  • Made for local processing. Indonesia’s mining law favours processing in the country, so supply is aimed at factories in North Sulawesi.

No volumes, grades or prices are published. The pilot runs from November 2026; supply terms depend on the pilot results and on the permit for selling associated minerals, and are agreed per contract. This is not an offer by the Provincial Government of North Sulawesi.