Site selection
Where should my plant go?
Compare six locations in North Sulawesi, and the places investors weigh them against, on cost, logistics, raw materials, power, talent, incentives, risk and living. You set the weights; every value has a source, and where we have none we say so.
Indicative model, not a site study. Free, and nothing is stored outside your browser unless you save or send it.
Your result
Strongest on: incentives, power reliability, cost.
Next in North Sulawesi: Manado (77), Bitung, outside the zone (75).
Best competitor in the model: Batam, 58/100.
North Sulawesi, ranked
For context: competing locations
Scored on the same scale, but fewer criteria have sourced values. A location is ranked only when at least 70% of your weights could be scored; below that we show “insufficient data to rank”.
Top 3 against the best competitor
Score per criterion: 0 at the centre, 100 at the edge. The scores are the same as in the ranking; your weights do not change them. A gap in an outline means no data.
- KEK Bitung (free zone)
- Manado
- Bitung, outside the zone
- Batam
Show the scores as a table
| Criterion | KEK Bitung (free zone) | Manado | Bitung, outside the zone | Batam |
|---|---|---|---|---|
| Cost | 94 | 94 | 94 | 59 |
| Logistics to market | 87 | 85 | 87 | 34 |
| Raw-material access | 89 | 88 | 89 | 30 |
| Power reliability | 99 | 99 | 99 | no data |
| Talent | 91 | 95 | 91 | no data |
| Incentives | 100 | 0 | 0 | 100 |
| Risk | 72 | 90 | 72 | 73 |
| Living for expatriates | 86 | 100 | 88 | no data |
On the map
Breakdown: KEK Bitung (free zone)
Show the full breakdown for KEK Bitung (free zone): values, sources and weights
| Criterion | Value | Score | Weight | Points |
|---|---|---|---|---|
| CostStatutory minimum wage per month, 2026, in US$. Lower is better. | US$ 219 a monthGovernor Decree 404/2025 (UMP 2026), as of 20 Dec 2025 | 94 | 3 | 14.8 |
| Logistics to marketStraight-line km from the site to its main port (North Sulawesi: Bitung), plus the average from that port to Tokyo, Shanghai and Busan. Lower is better. | 3,730 km (own calculation) | 87 | 3 | 13.7 |
| Raw-material accessStraight-line km to the nearest nickel park (IWIP Weda Bay or IMIP Morowali). Lower is better. | 332 km (own calculation) | 89 | 3 | 14.1 |
| Power reliabilityYour power need as a share of the spare grid capacity for the whole Suluttenggo system. 0% scores 100, 100% or more scores 0. | 0.8% of 173.9 MWPLN UID Suluttenggo via Sulut Review (16 Aug 2026): 991.36 MW available, 817.5 MW peak | 99 | 2 | 10.4 |
| TalentYour workforce as a share of the regency’s population (2024). 0% scores 100, 2% or more scores 0. | 0.19% of the populationInvestment Potential Map of North Sulawesi 2024 (DPMPTSP Sulut) | 91 | 2 | 9.6 |
| IncentivesLongest full corporate-income-tax holiday open to your plant at this site, in years. Higher is better. | 20 yearsMain activities: 10 years from Rp 100 billion, 20 years from Rp 1 trillionPMK 237/2020 jo. 33/2021 | 100 | 3 | 15.8 |
| RiskDisaster-risk index of the regency or city (BNPB IRBI 2023, all hazards). Lower is better. Natural hazards only, not political or social risk. | IRBI 104.87BNPB, Indeks Risiko Bencana Indonesia (IRBI) 2023, p. 153 | 72 | 2 | 7.6 |
| Living for expatriatesStraight-line km to Manado’s Sam Ratulangi international airport. Lower is better. | 27 km (own calculation) | 86 | 1 | 4.5 |
| out of 100 | 91 | |||
Why KEK Bitung (free zone)
Strongest on incentives, power reliability.
- 9 km in a straight line to Bitung port, the province’s international port.
- 534 ha free zone beside the deep-sea port, operating since 2019 PP 32/2014; kek.go.id
- 23.73 ha (4.4%) in use and 8 of 14 companies operating by Q2 2026; land readiness and infrastructure are the problems cited, so plenty of land but little of it serviced Zona Utara via Teras.id, 21 Oct 2026
- 114.96 ha listed as ready to develop under a BOT concession InvestSulut
- A pollution dispute at a recycled-paper mill in the zone (PT Futai) went to court in 2026; the lawsuit was rejected. Social licence matters here LBH Manado; Redaksisulut, 2026
- Your route: H. Plot in a free zone or industrial park
Next steps with these settings
How the score works
This is an indicative model for a first conversation, not a site study, a valuation or advice. It does not price land, construction or permits, and it does not replace a visit and due diligence. Status 12 November 2026.
Show the scoring steps, assumptions and data sources
- Every criterion gets a score from 0 to 100. Distances, wages, tax holidays and disaster risk are scaled between the best (100) and the worst (0) location on screen, so adding or removing competing locations changes them.
- Power and talent use fixed scales tied to your plant: the share of the grid’s spare capacity you would use, and the share of the local population you would hire. Raw materials use the distance to the nickel parks for metals, or the regency’s location quotient for agricultural and recovered materials.
- The total is the weighted average of the scored criteria. A criterion without a sourced value for a location is left out of that location’s total and shown as “no data”; the coverage tells you how much of your weighting was scored.
- Straight-line distances are our own calculation from approximate positions. Sailing and road distances are longer, and port calls and road quality are not modelled.
Model assumptions
- Power: 0% of the Suluttenggo spare grid capacity scores 100; 100% or more scores 0, linear in between.
- Talent: hiring 0% of the regency’s 2024 population scores 100; 2% or more scores 0, linear in between.
- Raw materials from agriculture or recovered materials: a location quotient of 2 or more scores 100; LQ 0 scores 0, linear in between.
- Wages, distances, tax holidays and disaster risk: scaled between the best (100) and the worst (0) location on screen; when every location has the same value, all score 50.
- Competing locations are ranked only when at least 70% of your weights could be scored, and are always listed below North Sulawesi.
- Risk covers natural hazards only (BNPB IRBI 2023: earthquake, volcano, flood, landslide, tsunami and other hazards). Political, social, regulatory and security risk are not scored; the “why this place” notes name known local issues where we have a source.
Data sources
- Logistics to market
- Own great-circle calculation from the main port (North Sulawesi: Bitung) to Tokyo, Shanghai and Busan; Jakarta and Surabaya; or Rotterdam and Los Angeles
- Raw-material access
- Own great-circle calculation to IWIP (Weda Bay) and IMIP (Morowali); location quotients from the Investment Potential Map of North Sulawesi 2024
- Power reliability
- PLN UID Suluttenggo via Sulut Review (16 Aug 2026): 991.36 MW available, 817.5 MW peak
- Incentives
- PMK 237/2020 jo. 33/2021 (KEK holiday); PMK 69/2024; other locations as on the Compare page
- Living for expatriates
- Own great-circle calculation to Sam Ratulangi international airport, Manado
- Positions
- Positions: facts.ts (zones and regency capitals); other ports from OpenStreetMap, rounded