Provinsi Sulawesi Utara · Indonesia
Invest North Sulawesi
Satellite image of KEK Bitung with the approximate zone centre, the port and the airport

Industry · Logistics · Export processing

KEK Bitung

Bitung Special Economic Zone

The industrial free zone on the Lembeh Strait, beside the deep-sea port that faces the Pacific shipping lanes.

534 haZone area · PP 32/2014
0%corporate tax for qualifying investments (10–20 years)
9 kmto Bitung deep-sea port (straight line)
27 kmto Manado international airport (straight line)

KEK Bitung

Key facts

Each figure with its source. Targets are labelled as targets.

Area
534 ha in Matuari district, Bitung City
kek.go.id (National SEZ Council), 2019
Legal basis
Government Regulation (PP) 32/2014; operating since 1 April 2019
kek.go.id (National SEZ Council), 2019
Focus
Coconut and fish processing, pharmaceuticals and logistics, in industry, logistics and export-processing zones
kek.go.id (National SEZ Council), 2019
Operator
PT Membangun Sulut Hebat, owned by the provincial government
kek.go.id (National SEZ Council), 2019
Land
92.7 ha of provincial land; 114.96 ha listed as ready to develop (build-operate-transfer)
InvestSulut (offline, last checked 13 Nov 2026)
Target at launch
Rp 35.2 trillion of investment and 34,710 jobs (a target, not a result)
kek.go.id (National SEZ Council), 2019

Ready-site check

Score 80%5 of 6 items verified

Score: items met out of items verified; a partly met item counts half, and items marked “not verified” do not count. Met: substation within 10 km, main road within 2 km, port within 60 min. Partly met: within 25 km, 10 km and 120 min.

Checked for the zone as a whole, not for a single plot. Plot availability comes from the zone administrator.

See power, roads and travel times on the map

What you get in the zone

National Special Economic Zone incentives, on top of what any PT PMA receives. Eligibility depends on your activity and investment size.

Corporate income tax holiday

Up to 100% reduction for 10–20 years, depending on investment size, for main activities in an free zone (KEK).

Tax allowance alternative

30% of investment value deductible from taxable income over 6 years, accelerated depreciation and up to 10-year loss carry-forward.

VAT & import facilities

VAT and luxury-goods sales tax are not collected on qualifying deliveries; import duty is suspended on capital goods and raw materials.

Land & licensing

One-stop licensing by the free-zone (KEK) administrator, property rights for foreign investors within the zone, and immigration facilities for expatriates.

Regional support

The provincial one-stop service (DPMPTSP Sulut) supports licensing via OSS-RBA and works to simplify procedures and secure legal and land certainty.

Corporate tax holiday by investment size

  1. 10 yearsfrom Rp 100 bn
  2. 15 yearsfrom Rp 500 bn
  3. 20 yearsfrom Rp 1 tn

100% reduction of corporate income tax for the main activity. Groups with a turnover of €750 million or more pay at least 15% under the global minimum tax, also during a holiday.

Sources: PP 40/2021 on Special Economic Zones; PMK 237/2020 as amended by PMK 33/2021; kek.go.id. Indicative, not tax advice. kek.go.id

Where the zone stands today

The honest picture, so you can plan with real numbers. We update this block when new figures appear.

4.4%of the 534 ha in use (23.73 ha, Q2 2026)Zona Utara via Teras.id, 21 Oct 2026
8 of 14registered companies operating (Q2 2026)Zona Utara via Teras.id, 21 Oct 2026
Rp 2.874 tninvestment recorded up to Q2 2026: the best-documented figureZona Utara via Teras.id, 21 Oct 2026
  • Other figures circulate. The governor named Rp 10.5 trillion on 30 April 2026, reported both as realised and as ready to enter.

    Tribun Manado, Apr 2026
  • An Investment Ministry director named Rp 6.5 trillion and called the zone stagnant. We use the lowest, best-documented figure.

    Tribun Manado, Nov 2026
  • The bottlenecks named are land readiness, infrastructure and a revision of the master plan. It also means land is available for new tenants.

    Zona Utara via Teras.id, 21 Oct 2026
  • Residents and a recycled-paper mill in the zone have been in a pollution dispute since 2024; a citizen lawsuit was rejected by the court in 2026. Plan community engagement and the environmental approval from day one.

    LBH Manado; Redaksisulut, 2026
  • In the pipeline: a nutmeg processing plant is being prepared, and coconut processor PT Awilton Nyiur Internasional is building in the zone.

    Sulut Review, 30 Apr 2026; Antara Sulut

How to locate here

From first call to opening day. We guide each step with the zone administrator and DPMPTSP North Sulawesi.

  1. Intake call

    Your product, raw materials, land, power and staff needs. We check whether the zone fits.

  2. Route and site

    Choose your route to raw materials, visit the zone with the administrator and shortlist plots.

  3. Company

    Set up a PT PMA with the right business lines (KBLI) through OSS-RBA.

  4. Zone facilities

    Apply through the zone administrator for the tax holiday and the customs and VAT facilities.

  5. Land and permits

    Land agreement with the zone, environmental approval (AMDAL or UKL-UPL) and building approval (PBG).

  6. Build and hire

    Contractors, utilities including power, hiring and training, or a faster start in a turnkey prefab plant.

  7. Operate

    Produce and export through Bitung port. We stay on for aftercare and compliance.

Location, photos and sectors

The marker shows the approximate zone centre. Plot boundaries are not published here; we request plot maps from the zone administrator for your shortlist. Straight-line distances from the zone centre; road distances are longer.