
Regency · Sulawesi Utara
Bolaang Mongondow
The largest regency (22.5% of the province): rice, plantations and gold, plus the Lolak dam (a National Strategic Project).
Concrete investment opportunities
ESMI 10-tonner: cleaning up mine wasteTurn toxic gold-mine waste into clean land, bricks and recovered gold, starting with a permitted 100 ha site in Bolaang Mongondow.- Ticket size
- From US$ 10 million, in tranches of US$ 1.7 million per machine
- Stage
- Pilot · Step 4 of 5
- Land
- Site allocated
- Location
- Bolaang Mongondow
- Source
- ESMI investor brief, 1 November 2026 +1 more
North Sulawesi 2036: a second life for mined landA ten-year programme to make every mapped hectare of mining land in North Sulawesi safe and productive again: fields, forest, lakes, clean energy and eco-tourism.- Ticket size
- From US$ 10 million; programme up to about US$ 32 million
- Stage
- Plan · Step 2 of 5
- Land
- Candidate sites
- Location
- North Minahasa, Southeast Minahasa, Bolaang Mongondow
- Source
- North Sulawesi 2036 Investment Memorandum (ESMI, October 2026)
Investment sectors that fit this area





Economic specialisation
Location quotient per sector, average 2019–2023. Bars above the line are leading sectors.
Leadership
Control most of what happens on the ground: building approvals (PBG), local spatial suitability, land and village relations, regional taxes and levies, and local infrastructure.
LeadershipCommercial partner
Market research by Eko Vitaris
Need to go deeper? PT Eko Vitaris International prepares market research and market-entry support for Bolaang Mongondow.
Desk research: market size, competitors, regulation and the best locations. About one week.
Price on requestRequest this packageFull report with interviews, site selection and a business case.
Price on requestRequest this packagePartner selection, a visit programme in North Sulawesi and introductions to government and companies.
Price on requestRequest this packagePT Eko Vitaris International is affiliated with members of the northsulawesi.org team. This is a commercial service, separate from the public information on this site. Market research A–Z
Ready-site check
Score 67%3 of 6 items verified
Land status Not verified
Not published. We ask the administrator or the regency.
Spatial plan (KKPR) Not verified
Not verified for a site here. We ask the regency.
Power Met
Substation (150 kV) 6.1 km away, straight line
Water Not verified
No public source for industrial water supply yet.
Port Not met
145 min by car to Bitung port (fastest time, without traffic)
Score: items met out of items verified; a partly met item counts half, and items marked “not verified” do not count. Met: substation within 10 km, main road within 2 km, port within 60 min. Partly met: within 25 km, 10 km and 120 min.
Checked at the regency capital, Lolak, not for a specific site.