
Regency · Sulawesi Utara
North Minahasa
Home of KEK Likupang, and the second-largest FDI destination in H1-2025.
On film
Videos by their respective channels on YouTube; they load from youtube-nocookie.com only after you press play.
Concrete investment opportunities
Likupang Esports & Entertainment District: arena, production studio and game-services campusAn esports and events destination on the coast of North Minahasa with a game-services campus in Manado: an estimated US$ 75–110 million in phases, starting with the campus and a production studio of about US$ 20–30 million.- Ticket size
- About US$ 75–110 million in phases; phase 1 about US$ 20–30 million (estimate)
- Stage
- Idea · Step 1 of 5
- Land
- No site yet
- Location
- North Minahasa, Manado City
- Source
- Games, esports and animation research, northsulawesi.org (13 November 2026) +4 more
North Sulawesi AI Hub: an AI campus at Indonesia’s Pacific gatewayA phased AI and cloud campus beside two trans-Pacific cable landings, powered by geothermal energy: Phase 1 from US$ 100 million, growing to about 100 MW of IT load.- Ticket size
- Phase 1 from US$ 100 million; about US$ 1.7–1.8 billion in total (estimate)
- Stage
- Idea · Step 1 of 5
- Land
- Candidate sites
- Location
- North Minahasa, Manado City, Bitung City
- Source
- Data-centre investor dossier, northsulawesi.org/data-centres (13 November 2026) +3 more
North Sulawesi 2036: a second life for mined landA ten-year programme to make every mapped hectare of mining land in North Sulawesi safe and productive again: fields, forest, lakes, clean energy and eco-tourism.- Ticket size
- From US$ 10 million; programme up to about US$ 32 million
- Stage
- Plan · Step 2 of 5
- Land
- Candidate sites
- Location
- North Minahasa, Southeast Minahasa, Bolaang Mongondow
- Source
- North Sulawesi 2036 Investment Memorandum (ESMI, October 2026)
Investment sectors that fit this area











Economic specialisation
Location quotient per sector, average 2019–2023. Bars above the line are leading sectors.
Leadership
Control most of what happens on the ground: building approvals (PBG), local spatial suitability, land and village relations, regional taxes and levies, and local infrastructure.
LeadershipCommercial partner
Market research by Eko Vitaris
Need to go deeper? PT Eko Vitaris International prepares market research and market-entry support for North Minahasa.
Desk research: market size, competitors, regulation and the best locations. About one week.
Price on requestRequest this packageFull report with interviews, site selection and a business case.
Price on requestRequest this packagePartner selection, a visit programme in North Sulawesi and introductions to government and companies.
Price on requestRequest this packagePT Eko Vitaris International is affiliated with members of the northsulawesi.org team. This is a commercial service, separate from the public information on this site. Market research A–Z
Ready-site check
Score 100%3 of 6 items verified
Land status Not verified
Not published. We ask the administrator or the regency.
Spatial plan (KKPR) Not verified
Not verified for a site here. We ask the regency.
Power Met
Substation (70 kV) 4.9 km away, straight line
Water Not verified
No public source for industrial water supply yet.
Port Met
19 min by car to Bitung port (fastest time, without traffic)
Score: items met out of items verified; a partly met item counts half, and items marked “not verified” do not count. Met: substation within 10 km, main road within 2 km, port within 60 min. Partly met: within 25 km, 10 km and 120 min.
Checked at the regency capital, Airmadidi, not for a specific site.