Provinsi Sulawesi Utara · Indonesia
Invest North Sulawesi

North Sulawesi AI Hub: an AI campus at Indonesia’s Pacific gateway

A phased AI and cloud campus beside two trans-Pacific cable landings, powered by geothermal energy: Phase 1 from US$ 100 million, growing to about 100 MW of IT load.

Status: In preparation with PLN and DPMPTSP · expressions of interest welcome

Deal sheet

Ticket size
Phase 1 from US$ 100 million; estimated total about US$ 1.7–1.8 billion in phases to about 100 MW, excluding tenant IT and GPUs
Stage
Idea · Step 1 of 5Site and power in preparation; feasibility study next
Land
Candidate sitesKauditan cable corridor, Mapanget (Manado) or KEK Bitung; no permitted plot yet.
Location
North Minahasa, Manado City, Bitung City
Source
  • Data-centre investor dossier, northsulawesi.org/data-centres (13 November 2026)
  • Turner & Townsend Data Centre Construction Cost Index 2026–27
  • IRENA Renewable Power Generation Costs in 2024
  • PLN UID Suluttenggo system figures (August 2026)

Every value comes from the project’s own documents, listed under Sources. Where those documents do not give a value, we show “Not yet known” instead of an estimate.

2trans-Pacific cables landing in the province (SEA-US 2017, Bifrost 2025)
120 MWgeothermal power on the grid at Lahendong
≈ 174 MWgrid reserve in the Suluttenggo system (August 2026)
≈ US$ 1.7–1.8 billionestimated total investment to ≈ 100 MW, excluding tenant IT and GPUs

The challenge

Indonesia requires public-scope systems to keep their data in the country, and demand for cloud and AI capacity keeps growing. Hyperscalers need a second Indonesian region with its own cable route, clean power and room to grow, far from the existing hubs around Jakarta and Batam. North Sulawesi has the cables and geothermal power, but no data-centre site with a signed power supply yet.

The approach

  1. 1
    Site

    A named plot in the Kauditan cable corridor, Mapanget (Manado) or KEK Bitung, reserved for 12–24 months with milestones.

  2. 2
    Power

    A PLN connection study and supply agreement for Phase 1, with renewable certificates; new geothermal capacity for the later phases.

  3. 3
    Campus

    Phase 1 of about 8–10 MW of IT load, growing to 25, 50 and about 100 MW as demand and power allow.

  4. 4
    Partnership

    A transparent selection in two stages (expression of interest, then proposals), issued by the Provincial Government or the KEK administrator.