Plant configurator
Design your plant in KEK Bitung
Pick what you make, set the capacity and watch a prefabricated plant assemble in the free zone beside Bitung’s deep-sea port. See the plot, build time, power need and jobs at once, then send the design to our team.
- Plot
- 4.2 ha
- Built area
- 14,310 m²
- Peak power
- ≈ 1.4 MW
- Jobs
- ≈ 454
- Months
- ≈ 13 to production
- Building cost
- ≈ US$ 6.6–7.2 million
Indicative, for discussion; no rights can be derived from it. Costs on request.
Loading the 3D view
Your design
Prefab factory hall in KEK Bitung: 10,800 m² hall floor in 36 prefab bays, 2-shift operation, medium automation, phase 1. Plot about 4.2 ha. Indicative: 13 months to production, 1.4 MW peak power, about 454 jobs. Solar roof of about 1.4 MWp.
14,310 m² built area · Grid connection via PLN; large users plan their own supply · Solar roof: about 1.4 MWp peak
Indicative, for discussion; no rights can be derived from it. Costs on request.
Site plan
Concept site plan to scale, with zones, flows and the key dimensions. Print it on A3 or A4 landscape, or choose Save as PDF in the print dialog.
N ↑ North (indicative) · 1:1,000 (A3)
Legend
- Production hall
- Warehouse
- Office
- Utilities
- Process yard
- Roads and truck courts
- Planted green
- Phase 2 reserve
- Car park
- Accessible parking
- Rainwater tank
- Raw material in
- Finished goods out
- Staff route
- Fire lane
- Escape corridor
- Truck turning circle (12.5 m)
- Project
- Prefab factory hall, KEK Bitung
- Drawing
- Site plan, concept
- Scale
- 1:1,000 on A3, 1:1,414 on A4
- Date
- 22 Nov 2026
- Status
- Concept, indicative. Not for construction.
- Prepared by
- northsulawesi.org plant configurator
- Sheet
- 1 of 1
- Key figures
- Plot 42,021 m² · hall 10,800 m² · coverage 34% · green 27% · checks 14/14
Design standards check
14 of 14 checks pass
Advice items are not scored.
We check this concept layout against Indonesian building law and international practice for industrial sites. It is a first check for discussion, not a permit: the KEK Bitung estate regulation, the fire brigade and the engineer of record have the final word.
Material flow (Passes)Best practice
U-flow: receiving (3 docks) and dispatch (2 docks) sit side by side on one truck court, and goods never go back through the hall. Accepted practice for this kind of plant.
Source: IFC General EHS Guidelines (2007) §3.4 traffic safety
Staff and truck traffic (Passes)Best practice
A staff gate and a truck gate 109 m apart, and the car park outside the truck courts, so people on foot do not cross the truck yard.
Source: IFC General EHS Guidelines (2007) §3.4 traffic safety
Truck court depth (Passes)Indicative assumption
40 m clear in front of the docks, so an 18 m truck and trailer can reverse in (minimum 36 m, preferred 40 m).
No building code sets this depth: it is common industrial practice.
Source: Industrial practice: 36 m minimum, 40 m preferred (Link Logistics, ENCOR, WARE 2025–26)
Truck turning (Passes)Best practice
Every truck court holds a 25 m turning circle, the space an articulated truck needs to turn (12.5 m outer radius).
Source: EU Directive 96/53/EC Annex I 1.5; PP 55/2012 Pasal 54
Site coverage (KDB) (Passes)Indicative assumption
Buildings cover 34% of the plot now and 51% once phase 2 is built, within the indicative 60%.
Indonesia has no national maximum for industrial plots: the KEK Bitung estate regulation sets it. 60% is common estate practice and is to be confirmed.
Source: Permenperin 40/2016 (KDB set by local or estate rules); KEK estate regulation, PP 40/2021 Pasal 151
Green area (KDH) (Passes)Law
27% of the plot stays green (11,537 m², including a 4 m planted buffer along the fence). At least 10% is required. The phase 2 reserve is not counted.
Setbacks (GSB) (Passes)Law
Buildings stand 19 m behind the front fence (minimum 6 m, or half the road reserve if that is wider) and at least 8 m from the other boundaries.
On the coast, buildings also keep 100 m from the highest tide line.
Fire separation between buildings (Passes)Law
The closest pair of buildings is 23 m apart; 6 m is required for their height.
Fire brigade access (Passes)Law
A 6 m fire lane runs along 100% of the main building, 3 m from the walls (100% required for 181,116 m³). The lanes form a loop, so there are no dead ends.
Hydrants within 50 m of every part of the lane are placed in the detailed design.
Escape distances (Passes)Best practice
No point in the hall is more than 30 m in a straight line from an outside wall or a protected escape corridor (corridors: 1). Benchmark: 61 m walking distance without sprinklers, 76 m with.
Real walking routes around machines are longer, so the layout keeps straight lines within 45 m.
Room to grow (Passes)Indicative assumption
The phase 2 reserve (7,200 m², 17% of the plot) sits beside the first hall and continues the same flow, so nothing has to move.
Source: Planning assumption (no code value)
Rooftop solar (Passes)Law
About 1.4 MWp on the roof, capped at the 1.4 MW peak demand: power exported to the PLN grid is not credited, so the system is sized for own use. The roof could carry about 1.4 MWp.
Rainwater (Passes)Law
Rain from about 14,310 m² of roof goes to a harvesting tank in the utility yard and to infiltration wells in the green buffer, as the law requires.
Source: Permen LH 12/2009 Pasal 3
Accessibility (Passes)Law
Accessible parking next to the office entrance and a step-free route into the office. Accessible toilets and routes follow in the detailed design.
Source: Permen PUPR 14/PRT/M/2017
Earthquake design (Advice)Law
Bitung lies in a moderate-to-high earthquake hazard area. The structure must be designed to SNI 1726:2019 with the site values from the national hazard map. Rectangular buildings and a separate office keep the plan regular.
Source: SNI 1726:2019; PuSGeN 2017 hazard map (RSA Cipta Karya)
Coast, tsunami and flood (Advice)Law
Check the plot in BNPB InaRISK. Plots near the shore need a raised floor level and a marked evacuation route.
Source: Perpres 51/2016; Perda Bitung 5/2015 Pasal 24(3); BNPB InaRISK
Utilities and staff
- Grid connection
- ≈ 1,620 kVA, PLN class I-3
- Staff per shift
- ≈ 204 per shift × 2 + 45 office staff
- Staff water
- ≈ 22.7 m³ a day
- Process water
- –
- Domestic wastewater
- ≈ 13.6–18.2 m³ a day
- Minimum payroll floor
- ≈ Rp 25.9 billion a year
Peak demand at power factor 0.85: PLN bills reactive power below 0.85 (Permen ESDM 28/2016). Class I-3 above 200 kVA, I-4 from 30,000 kVA.
50 litres per employee per day for factories and offices (SNI 03-7065-2005).
Depends on the process: sized in the written proposal.
60–80% of staff water use (design range in Permen PUPR 04/PRT/M/2017).
Jobs × the minimum wage in Bitung (2026) of Rp 4,002,630 a month: Bitung has no own UMK in 2026: the UMP applies (Governor Decrees 404/2025 and 407/2025, via GoodStats), as of 3 Feb 2026. In 2026 that is the North Sulawesi UMP, as Bitung set no separate UMK. 13 months including THR, plus 10.24% employer BPJS. Real wages are usually higher.
Indicative, to be confirmed in a written proposal. Our team works with total investment plans from US$ 10 million.
Building cost range
≈ US$ 6.6–7.2 million
Indicative, to be confirmed in a written proposal. Our team works with total investment plans from US$ 10 million.
Buildings only: production floor at Jakarta factory rates (US$ 444–490/m²), warehouse and cold store at shell rates (US$ 411–446/m²), offices at office rates (US$ 829–923/m²). Source: Arcadis Construction Cost Handbook 2025, Jakarta, Q4 2024, excluding VAT and contingencies. Not included: land lease, site works, machinery, cold-store refrigeration, connection fees and any Bitung price difference. Source (PDF)
Compare two variants
Keep this design as variant A, change the settings and compare.
Indicative timeline
≈ 13 months to start of production. Indicative, for discussion; no rights can be derived from it. Costs on request.
Next steps
- Send us this design with your product and timeline.
- We check plot, power and permits with the KEK Bitung administrator.
- You receive a site and design proposal with a fixed price per phase.
- Visit the site during Investor Week.
Open the tax calculator with 454 jobsTurnkey factory in KEK BitungManufacturing in North Sulawesi
How the estimate works
How we estimate: the plot is the fenced site drawn in 3D, sized for phase 1 and 2 with yards and roads. Power is the hall area times a planning figure per plant type (W/m²), adjusted for automation. Jobs are the hall area divided by a typical floor area per worker, times the shifts. Build time adds design and permits, a prefab build of 5 to 12 months and line installation. These are planning rules of thumb, not a design or a quote; firm figures only come in a written proposal.