Provinsi Sulawesi Utara · Indonesia
Invest North Sulawesi
← Data Centres & AI Compute
Invest North Sulawesinorthsulawesi.org · Provinsi Sulawesi Utara · Indonesia

Pusat Data & Komputasi AI · Tertiary

Data Centres & AI Compute

Two trans-Pacific cables land at Manado and geothermal power runs at Lahendong: a base for in-country cloud, disaster-recovery and AI capacity, if you secure your own power supply.

Why invest here

Not a province priority in the Investment Book 2024; this is our own assessment. Data-centre demand is moving to places that still have power and cables. In January 2022 Dublin’s grid operator EirGrid said new Dublin data centres were unlikely to be connected before 2028. Amsterdam and Haarlemmermeer paused new data centres in July 2019 and now cap them. Singapore stopped new builds from 2019 and now admits capacity only by tender: about 80 MW awarded in July 2023, and at least 200 MW offered in a second call in December 2025. Indonesia keeps data at home. Public-scope electronic-system operators must process and store their data in Indonesia (PP 71/2019, art. 20), banks need OJK approval to place systems abroad (POJK 11/POJK.03/2022, art. 35), and the Personal Data Protection Law (UU 27/2022) has applied in full since October 2024. North Sulawesi has the cables. The SEA-US system (Telin with partners, in service since August 2017, about 14,500 km, 20 Tbps design capacity) lands at Kauditan in North Minahasa and links Manado with Davao, Guam, Hawaii and Los Angeles. Telin also landed the Bifrost cable (with Meta and Keppel) at Manado in February 2025. Power is the limit. The Lahendong geothermal field supplies 120 MW (four 20 MW PLN units and two 20 MW PGE units), but the reserve of the whole Suluttenggo grid was only about 174 MW in August 2026. A large site therefore needs its own supply contract with PLN, or new generation. A phased AI hub of about 100 MW of IT load needs an estimated US$ 1.2 billion of construction at Turner & Townsend’s Jakarta index (US$ 11.96 per watt, 2026–27), before land, grid works, new generation and IT equipment; phase 1 starts from US$ 100 million, about 8 MW.

Investment ideas

  • Carrier-neutral colocation data centre near the Manado cable landing, built in phases from 10 MW with its own PLN supply contract (phase 1 from US$ 100 million)
  • In-country disaster-recovery and cloud campus for Indonesian banks and public-scope operators, far from Jakarta and Batam (phase 1 from US$ 100 million)
  • AI inference and GPU hall sized to a dedicated power-supply agreement, with Lahendong green-energy certificates (phase 1 from US$ 100 million)
  • Interconnection and meet-me facility for carriers, content networks and the eastern Indonesian cable systems, as part of a data-centre campus (phase 1 from US$ 100 million)

Rules and licensing

  • Data processing and hosting (KBLI 2020 codes 63111 and 63112; KBLI 2025 codes 63101 and 63102, used in OSS since June 2026) are not on the closed or restricted parts of the Positive Investment List (Perpres 10/2021 as amended by Perpres 49/2021). A PT PMA can therefore in principle hold 100%; check the ownership tab for your exact code in OSS.
  • Public-scope electronic-system operators must manage, process and store their systems and data in Indonesia (PP 71/2019, art. 20); private-scope operators may do so abroad (art. 21). Banks must keep their data centre and disaster-recovery centre in Indonesia unless OJK approves otherwise (POJK 11/POJK.03/2022, art. 35–36).
  • Personal data falls under the Personal Data Protection Law (UU 27/2022, in full force since 17 October 2024).
  • Power above a few megawatts needs a supply agreement with PLN; we found no special data-centre tariff. PLN sells green-energy certificates (REC) from Lahendong.
  • KEK Bitung (PP 32/2014) covers industry, logistics and export processing, not data centres, so its tax holiday does not apply automatically. This is not legal advice.