Cost guide
Cost guide: Bitung City · Outside a free zone
Land, building, power, water, wages and company set-up: the published figure for each, with its source and date. Where no official figure is published, the guide says so instead of guessing.
Land
- Land value elsewhere in the regencyNot published
Each regency sets land tax values per parcel zone; they are not published as a table. Check a parcel with the regency revenue office (Bapenda) or the land agency (BPN).
Building
- Construction cost index (Surabaya = 100)96.3
Below 100 is cheaper to build than Surabaya, above 100 dearer. Use it to scale a builder’s quote, not as a price.
BPS, Indeks Kemahalan Konstruksi Provinsi dan Kabupaten/Kota 2025 (via Katadata Databoks) · 1 Oct 2025
- Warehouse, Jakarta referenceRp 6,450,000 – Rp 7,400,000 per m²
- Factory, Jakarta referenceRp 7,450,000 – Rp 8,600,000 per m²
- Office, 10–25 floors, Jakarta referenceRp 13,000,000 – Rp 14,200,000 per m²
- Three-star hotel, Jakarta referenceRp 18,900,000 – Rp 22,700,000 per m²
Per m² of floor area, including foundations and external works; excludes land, fees and VAT. No per-m² survey is published for North Sulawesi; the regency index above shows the difference with Surabaya.
Rider Levett Bucknall, Singapore & Regional Report 1H 2025 (prices as at Q1 2025) · Jun 2025
Electricity
- Industrial power tariff PLN I-3 (above 200 kVA)Rp 1,114.74 per kWh
The national tariff applies in every regency, before VAT.
PLN tariff Q4 2026 (CNBC Indonesia) · 4 Nov 2026
Water
- Piped water, industrial customersNot published
The industrial tariff of the local water utility is not published. Ask the utility; inside a free zone, ask the zone administrator.
- Piped water, households (for comparison)Rp 6,000 – Rp 10,200 per m³
Households only: the industrial rate under the same decree is not published.
Perumda Air Minum Duasudara, Mayor’s Decree 188.45/HKM/SK/39/2025 (Totabuan News) · 1 Mar 2025
Wages
- Minimum wage (provincial minimum, UMP)Rp 4,002,630 a month
This regency has no own minimum in 2026; the provincial minimum applies.
Governor Decree 404/2025 (UMP 2026) · 20 Dec 2025
Company set-up
- Minimum paid-up capital, PT PMARp 2,500,000,000
Per company (BKPM Regulation 5/2025), as in the company set-up planner.
BKPM Regulation 5/2025 · Oct 2025
- Minimum investment plan per business line and location, PT PMARp 10,000,000,000
Above Rp 10 billion per 5-digit business code (KBLI) per location, excluding land and buildings.
BKPM Regulation 5/2025 · Oct 2025
- Government fee: legal-entity approvalRp 1,100,000
- Government fee: company name approvalRp 100,000
PP 45/2024: approval of the company name (tvOne News) · 23 Oct 2024
- Notary fee for the deedNot published
Notary fees are agreed with the notary and not published.
Indicative figures from public sources, not an offer, quote or financial advice; no rights can be derived from them. Sources checked on 14 November 2026. Disclaimer
Indicative figures from public sources, as checked on 14 Nov 2026. Not an offer or a quote. northsulawesi.org/cost-index